مشاريع طلاب خريف 2022 - F22
اقتراح لإنشاء مكتب إدارة المشروع” PMO” في المؤسسة العامة للإسكان في سوريا
Proposal for a Project Management Office "PMO" in the Public Establishment of Housing in Syria
This study highlighted the importance of applying modern project management methodologies in Syria in order to keep pace with the global market, especially through adopting Project Management Offices (PMO) in its construction industry as (PMO) is the ideal approach in managing projects efficiently and successfully.
The Public Establishment of Housing in Syria has been selected as a case study because of the importance of the housing sector in Syria, which was affected by the Syrian crisis and the recent earthquake, which led to an increase in the demand for housing.
A framework has been proposed and developed for PMO implementation and operation in the Public Establishment of Housing in Syria. This proposed Project Management Office aims to improve the reality of its project management by ensuring that these projects are completed in a timely manner, within budget limits, and to the required quality standards.
The methodology used in this research included two axes: the first is a study of the literature for a deep understanding of PMO, and the second is interviews with housing organization employees to identify current practices in project management in the organization and what problems they suffer from, and then suggest the appropriate type of project management office for it.
إعداد: الطالبة سوسينا مفيد الشوفي
إشراف: الدكتور المهندس محمد شعبان
اقتراح لإنشاء مكتب إدارة المشروع” PMO” في المؤسسة العامة للإسكان في سوريا
تكامل التصميم والبناء الافتراضي VDC مع البعد الرابع من نمذجة معلومات البناء BIM 4D
(حالة مبنى فرع نقابة الصيادلة في طرطوس)
THE INTEGRATION OF VIRTUAL DESIGN AND CONSTRUCTION (VDC) WITH THE FOURTH DIMENSION OF BUILDING INFORMATION MODELING (4D BIM)
The aim of the research is to shed light on the relationship between the concepts of Virtual design and construction (VDC) and building information modeling (BIM), and in particular to identify and evaluate the potential benefits of using a methodology based on the integration of the fourth dimension of (4D BIM) with virtual design and construction (VDC) and its impact on the preparation of the schedule and project planning and construction simulation. The research reviews a case study of "Pharmacists Syndicate building - Tartous branch", the building model (3D BIM) was created in Autodesk Revit 2020 ®, then the model clash was detected, reviewed and resolved, and the quantities were calculated on the Autodesk Navisworks Manage 2020 ® program, and the time periods for each activity were estimated according to the quantities, workshop performance rates and teams.
The results showed the importance of (4D BIM) and the use of software in accurate modeling of all building elements and solving design problems before construction, which in turn has a significant impact on reducing time and cost of the project implementation.
إعداد: الطالبة نغم محمد سلمان
إشراف: الدكتورة منى حمادة
نمذجة الأبنية القائمة وتأثير تطبيق BIM على إدارة المرافق
Modeling Existing Buildings and Effects of Applying BIM on Facility Management
This study aims to explore the value of BIM and the challenges affecting its application in facility management, as well as modeling and create an interface for existing building to efficiently address the information required to manage existing buildings and challenges to maintain a continuous data update. The research methodology is based on descriptive method.
The research suggested a BIM model for an existing building and its transition from CAD to BIM, including all asset’s information needed for maintenance and operation processes in a digital format that helps facilitate the process of transferring and updating information to a 3D environment. The research developed an interface which act as a bridge between the various tools used to update, edit and link data from and to the BIM model. Also, can be used by non -specialist maintenance teams by linking in-form maintenance schedules with Excel data and digitally reviewing and controlling assets on the cloud-based Autodesk Tandem platform to visual display, update and manage data, with easy navigate and controlled access for all teams, and finally to achieve an effective BIM model that serves and improves facility management and can be updated during the building's life cycle.
إعداد: الطالبة رانيه سلمان
إشراف: الدكتورة المهندسة رنا ميا
إدارة مخاطر صناعة البناء في سوريا بالاعتماد على منهجيتي سكرم/كانبان
Managing Risks Based Scrum/Kanban Methodologies In Syrian Construction Industry
Construction project risk management is one of the managements that receives huge attention in the world. As the success of any project is closely related to the effectiveness of risk management. However, in terms of the construction industry in Syria, there are clear shortcomings and gaps in risk management. So to assess the actual reality of the Syrian construction industry with all its details (project management methodologies - software - risk management methodologies - new technology), this study relied on the descriptive analysis method of data collected through a questionnaire, where the questionnaire was directed Syrian project management professional engineers over the entire area of the Syrian Arab country.
The novelty of this research comes from the fact that it provides a framework for managing the risks of construction projects in Syria with a methodology that combines the strengths of Scrum methodology and the strengths of Kanban methodology.
The importance of this study stems from the fact that the proposed risk management framework can be linked in an integrated manner to the development approach of project management, whether predictive or adaptive.
إعداد: الطالبة نسرين محمود روميه
إشراف: الدكتور عبد السلام شيباني
إدارة مخاطر صناعة البناء في سوريا بالاعتماد على منهجيتي سكرم/كانبان
فاعلية استخدام تقنية نمذجة معلومات البناء في تحسين تخطيط موقع التشييد اعتماداً على منهجية التفكير التصميمي ( حالة دراسية )
The effectiveness of using Building Information Modeling technology in improving construction site planning based on the design thinking methodology (case study)
This research aims to study the effectiveness of BIM technology in improving construction site planning using a Design Thinking methodology that focuses on those involved. The researcher used the descriptive approach to study the benefits of using BIM technology in site planning and used the personal interview tool to obtain information that serves to complete the application of the Design Thinking methodology, and also used the experimental approach to apply the Design Thinking methodology to an engineering company.
The results of this research show the most important requirements of clients and workers on the site and the most important problems that lead to Failure to meet those requirements through the personal interviews, and show that BIM technology is an effective solution for reducing problems caused by poor site planning through the application of the Design Thinking methodology.
It reduced cost and time overruns, quality degradation, and risk reduction on-site through its capabilities in detecting spatial conflicts and expected risks, clear visualization and realistic simulation of all aspects of the site, accurate estimation of quantities, effective resource planning, dynamic nature to keep up with changes, and involving contractors in early stages of project planning so they can identify workspace conflicts.
إعداد: الطالبة ايمان عبد اللّه جروان
إشـــراف: الدكتور المهندس عبد السلام شيباني
تقييم كفاءة الدور المجتمعي للعمل الهندسي في إدارة الكوارث الطبيعية ( دراسة تطبيقية على مدينة جبلة في إدارة زلزال 6 شباط 2023)
Evaluating the Efficiency of Social Role for Engineering Work in Natural - Disaster Management - Case study on the city of Jableh in earthquake management 6th February 2023-
The aim of the research is to assess the societal role of engineering work in the management of natural disasters such as earthquakes, identify the strengths and weaknesses of disaster management strategies, as well as to identify further improvements and technical innovations to improve the ability of communities to adapt to the conditions of seismic disasters, and also contribute to the development of more effective relief plans.
Among the most prominent findings of the research are the clarity of the societal role of engineering work in responding to the disaster after the earthquake of February 6, 2023 in the Syrian city of Jableh, the importance of the government's role in responding to the crisis, the need to improve seismic studies of facilities and the weak availability of modern technology techniques that improve the response to earthquakes.
At the end of the research, some suggestions and recommendations were reached that could be adopted to enhance the role of engineering work in the management of disasters caused by earthquakes, such as the need to find a coordination mechanism for disaster response, integrating Geographic Information Systems with building information modeling, developing reconstruction plans, maintaining environmental sustainability, and developing unified models for collecting basic information.
إعداد: الطالبة رزان الحكم الدقاق
إشراف: الدكتورة المهندسة سونيا أحمد
المهندسة سوسن أحمد
تطوير خطة لتبني نمذجة معلومات البناء كأداة إلدارة المشاريع في قطاع البناء والتشييد.
Developing a Plan to Adopt BIM as a Tool for Project Management in AEC Industry
This Research discusses a case study that describes throughout its phases how a Syrian company transmitted to work in the BIM environment officially including the reasons that pushed it towards this strategic turnover and the objectives hoped from it, in a way that benefits the company's vision and Goals, the research also contains all the documents that were adopted for a proper transformation.
• Then the research previews the typical project C-218, in which the whole process had been implemented with an explanation of work phases within the project’s life cycle in the BIM environment and BIM office hierarchy describing roles and tasks assigned to each member and all levels and dimensions that had been reached, in addition to demonstrating the method of archiving, coding, and naming, and then comparing maturity levels reached the beginning of the project and at the end of it, in addition to mentioning all used software and platforms in each phase from conceptual design to shop drawings and handover.
• Then the study heads to dictate how BIM has fulfilled the 10 knowledge areas in project management, and how they were controlled whether 8 using BIM software or BIM documents or throughout the BIM working environment
• At the end of the research, results, and recommendations were discussed with the conclusion of its benefits and effects. The research also high light some of the missing practices and documents and how to improve this experience to reach further levels and better results.
إعداد: الطالب المهندس عيسى فيصل الحمّود
إشراف: الدكتورة سونيا أحمد
تطوير خطة لتبني نمذجة معلومات البناء كأداة إلدارة المشاريع في قطاع البناء والتشييد.